Go to Publicity
«Back to news

News

12.02.2017 - 10: 29

"Turkish Stream" Turkish Prime Minister said in Kiev, "which side Turkey»

During today's official visit to Kiev, the Turkish Foreign Minister Mevlut Cavusoglu said that the project to build a gas pipeline "Turkish Stream" will be built in accordance with the interests of Turkey, and is not directed against Ukraine, which is worried that as a result significantly reduce the volume of pumping Russian gas through Ukrainian territory - and as a result, the state budget does not receive less money for transit.

"We consider all the projects from the point of view of our national interest and energy security. We have no intention to implement these projects through the steps that are directed against any country, "- said the Turkish prime minister, according to which is completely wrong to put the question" which side Turkey "when discussing energy projects on the territory of the republic. According to him, Turkey - on its side.

Cavusoglu also said that he discussed with Ukrainian President Petro Poroshenko of Ukraine's possible participation in the project TANAP pipeline.

According to Cavusoglu, the Turkish President Recep Tayyip Erdogan will visit Moscow and Kiev in the coming months, but has not yet determined the exact date of the visit.

Earlier, Russia and Turkey have ratified the agreement on the "Turkish Stream". The last point on the merits delivered Russian President Vladimir Putin, who in February 7 put his signature on the corresponding document.

Gas mains "Turkish Stream" should be laid under the Black Sea from Russia (from the compressor "Russian" station in the Krasnodar region) to a receiving terminal on the coast of Turkey. The pipeline will consist of two lines maximum capacity 15,75 billion cubic meters of gas a year each. One of them will be designed to supply Turkish consumers, the second - for the transport of fuel to the border with Greece, and possibly further - in the southern European countries. The length of the underwater section of the gas pipeline will be approximately 920 kilometers overland transit - about 200 km.

Begin to build a "Turkish Stream" later this year. Commissioning of the gas pipeline is scheduled for December 30 2019 years. However, the Russian authorities announced that the construction of a branch, on which the Russian gas could go to Europe, will begin only after the follow assurances from the EU that Russian gas will be in demand.

Total construction of the TANAP gas pipeline, which will run from the Georgian-Turkish border to the western border of Turkey, is estimated at 8,5 billion dollars. For the gas transmission pipeline will be transported to the "blue fuel" from Azerbaijani field "Shah Deniz". In the first stage of building an annual capacity of TANAP gas pipeline should reach 16 billion cubic meters of gas: one 6 billion intended for consumers Turkey, 10 billion cubic meters - to European consumers.

A source: TEKNO: /// BLOG

Tags: Turkey, Turkish stream, Gas, Economy, Ukraine

GTranslate Your license is inactive or expired, please subscribe again!